Substation Inspection Checklist: What to Check, How Often, and What the Findings Mean
A substation inspection checklist covering thermography, SF6 breakers, transformers, DC systems and grounding, with intervals and NETA criteria.
Practical guidance on keeping substation equipment in service: infrared thermography and what NFPA 70B now requires, DC battery installation and NERC PRC-005 maintenance, vacuum breaker leak testing, and transformer winding tests. Each article explains the method, the standard behind it and how often to do it, so maintenance plans are built on evidence rather than habit.
Need this done in the field? See our Maintenance & Consulting service
A substation inspection checklist covering thermography, SF6 breakers, transformers, DC systems and grounding, with intervals and NETA criteria.
Condition-based maintenance schedules substation service around measured equipment condition. How it works, when it beats time-based service, and how to start.
Vacuum breakers do not leak gas, they lose vacuum. Learn the four failure modes that raise internal pressure, why an AC hipot only returns pass or…
Substation battery maintenance explained: NERC PRC-005 station DC supply intervals for VLA, VRLA, and Ni-Cad banks, what IEEE 450 and IEEE 1188 capacity tests prove, why…
Substation infrared thermography explained: how a longwave IR camera finds hot connections on energized equipment, how NETA Table 100.18 grades delta-T findings, and what NFPA 70B…
Learn when transformer testing is required, including routine schedules, high-risk conditions, and IEEE standards that protect reliability and prevent costly failures.
Learn how to test transformer windings using proven methods and diagnostics. Improve reliability with resistance, TTR, insulation, and SFRA testing best practices.
Learn best practices for substation battery installation and maintenance. Discover how reliable battery systems support substation protection and avoid costly outages.